Anticipated Cost Report Settings
This section allows you to manage the general behavior, scenarios, and templates of the Anticipated Cost Report.Accessing the Settings Panel
You can access the settings panel by clicking the Settings (Settings and Scenario Management
Enable Scenario-Based Reporting
Enable Scenario-Based Reporting
- Function: By checking this option, you can create and manage multiple scenarios (e.g., “Optimistic Finish,” “Pessimistic Finish”) instead of a single default report.
- Effect: When this feature is activated, a Scenario Management (
) button is added to the top right corner of the report page.
Scenario Management
Scenario Management
When scenario-based reporting is active, you can manage your scenarios by clicking the Scenario Management (
) button in the top right.
- Interface: The opened window contains a scenario list, a button to create a new scenario, and an apply button.
- Actions:
- Select Scenario: You can select a scenario by clicking on it in the list.
- Edit/Delete Scenario: You can manage a scenario with the Edit (
) and Delete (
) icons that appear when you hover over it.